>
Fa
  |  
Ar
  |  
En
  
scientia iranica
  
سال:2013 - دوره:20 - شماره:6- E
  
 
A new method based on the multi-segment decision matrix for solving decision-making problems
- صفحه:2259-2274
  
 
Adapted Markovian model to control reliability assessment in multiple AGV manufacturing system
- صفحه:2224-2237
  
 
Analyzing the price skimming strategy for new product pricing
- صفحه:2099-2108
  
 
Consideration of transportation lags in a two-machine Flow shop scheduling problem
- صفحه:2215-2223
  
 
Design of a multi-stage transportation network in a supply chain system: Formulation and ecient solution procedure
- صفحه:2188-2200
  
 
Development of a method based on particle swarm optimization to solve resource constrained project scheduling problem
- صفحه:2123-2137
  
 
Intuitionistic fuzzy Choquet aggregation operator based on Einstein operation laws
- صفحه:2109-2122
  
 
Network revenue management under specic choice models
- صفحه:2161-2176
  
 
Optimal strategies for price, warranty length, and production rate of a new product with learning production cost
- صفحه:2247-2258
  
 
Performance indicator for a stochastic- ow manufacturing network with reworking actions based on reliability
- صفحه:2201-2214
  
 
Phase II monitoring of binary response proles
- صفحه:2238-2246
  
 
Single-item lot-sizing and scheduling problem with deteriorating inventory and multiple warehouses
- صفحه:2177-2187
  
 
The hierarchical hub covering problem with an innovative allocation procedure covering radiuses
- صفحه:2138-2160
  
 
Three meta-heuristics to solve the no-wait two-stage assembly ow-shop scheduling problem
- صفحه:2275-2283
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved