>
Fa   |   Ar   |   En
   scientia iranica   
سال:2013 - دوره:20 - شماره:6- E


  tick  A new method based on the multi-segment decision matrix for solving decision-making problems - صفحه:2259-2274

  tick  Adapted Markovian model to control reliability assessment in multiple AGV manufacturing system - صفحه:2224-2237

  tick  Analyzing the price skimming strategy for new product pricing - صفحه:2099-2108

  tick  Consideration of transportation lags in a two-machine Flow shop scheduling problem - صفحه:2215-2223

  tick  Design of a multi-stage transportation network in a supply chain system: Formulation and ecient solution procedure - صفحه:2188-2200

  tick  Development of a method based on particle swarm optimization to solve resource constrained project scheduling problem - صفحه:2123-2137

  tick  Intuitionistic fuzzy Choquet aggregation operator based on Einstein operation laws - صفحه:2109-2122

  tick  Network revenue management under specic choice models - صفحه:2161-2176

  tick  Optimal strategies for price, warranty length, and production rate of a new product with learning production cost - صفحه:2247-2258

  tick  Performance indicator for a stochastic- ow manufacturing network with reworking actions based on reliability - صفحه:2201-2214

  tick  Phase II monitoring of binary response proles - صفحه:2238-2246

  tick  Single-item lot-sizing and scheduling problem with deteriorating inventory and multiple warehouses - صفحه:2177-2187

  tick  The hierarchical hub covering problem with an innovative allocation procedure covering radiuses - صفحه:2138-2160

  tick  Three meta-heuristics to solve the no-wait two-stage assembly ow-shop scheduling problem - صفحه:2275-2283
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved