>
Fa
  |  
Ar
  |  
En
  
journal of industrial and systems engineering
  
سال:2007 - دوره:1 - شماره:1
  
 
A Multiprocessor System with Non-Preemptive Earliest-Deadline-First Scheduling Policy: A Performability Study
- صفحه:37-55
  
 
A Project Scheduling Method Based on Fuzzy Theory
- صفحه:70-80
  
 
A Quartic Quality Loss Function and Its Properties
- صفحه:8-22
  
 
Development of a Set of Algorithms for the Multi-Project Scheduling Problems
- صفحه:23-36
  
 
Layout Design of a Furniture Production Line Using Formal Methods
- صفحه:81-96
  
 
Product Development Decision Support System Customer-Based
- صفحه:56-69
  
 
The Hypergeometric Coupon Collection Problem and its Dual
- صفحه:1-7
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved