>
Fa   |   Ar   |   En
   Development of a Set of Algorithms for the Multi-Project Scheduling Problems  
   
نویسنده Chassemi-Tari Farhad ,Olfa Laya
منبع journal of industrial and systems engineering - 2007 - دوره : 1 - شماره : 1 - صفحه:23 -36
چکیده    In this paper, the problem of determining the best schedule for a set of projects has been modeled in the form of a generalized tardiness flowshop (gtf) problem. we develop a set of heuristic algorithms for minimizing the total tardiness of jobs in a gtf problem. in thegeneralized version of tardiness flowshop problems, a job is considered to be a collection of operations and there is a due date associated with the completion of each operation on each machine. four algorithms based on the concept of apparent tardiness cost (atc) aredeveloped for solving the gtf problem. the relative effectiveness of the developed algorithms will then be evaluated through an extensive computational experiment.
کلیدواژه Generalized tardiness flowshop; Multi-project scheduling; Intermediate due date;Apparent tardiness cost
آدرس sharif university of technology, Department of Industrial Engineering, ایران, allameh tabataba-i university, School of Management, ایران
پست الکترونیکی l_olfat@yahoo.com
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved