>
Fa
  |  
Ar
  |  
En
  
journal of industrial and systems engineering
  
سال:2011 - دوره:5 - شماره:1
  
 
A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times
- صفحه:1-19
  
 
A method of identifying suitable manufacturing system (Cellular) for automotive sector using Analytical Hierarchy Process
- صفحه:20-34
  
 
Development of a Generic Risk Matrix to Manage Project Risks
- صفحه:35-51
  
 
Queueing Inventory System in a Two-level Supply Chain with One-for-One Ordering Policy
- صفحه:52-62
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved