>
Fa   |   Ar   |   En
   A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times  
   
نویسنده Aliabadi Mohammad ,Jolai Fariborz ,Mehdizadeh Esmaeil ,Jenabi Masoud
منبع journal of industrial and systems engineering - 2011 - دوره : 5 - شماره : 1 - صفحه:1 -19
چکیده    Many authors have examined lot sizing, scheduling and sequence of multi-product flow shops, but most of them have assumed that set up times are independent of sequence. whereas dependence of set up times to sequence is more common in practice. hence, in this paper, we examine the discussed problem with hypothesis of dependence of set up times to sequence and cyclic schedule policy in basic period form. to do so, a mixed integer non-linear programming (nlp) model is developed for this problem. to solve the model these techniques are applied: heuristic g-group for determining the frequency of item production and assigning product to periods and three meta heuristic methods including hybrid particle swarm optimization , hybrid vibration damping optimization hybrid genetic algorithm are used to determine the sequence and economic lot sizes of each item. in addition, to compare these methods, some random problems are produced and computation of them shows the substantial superiority of hybrid particle swarm optimization.
کلیدواژه Flow shop ,Determining lot sizes ,Finite planning horizon ,Hybrid particle swarm optimization ,Basic period
آدرس islamic azad university, Department of Industrial Engineering, Islamic Azad University of Qazvin, ایران, university of tehran, Department of Industrial Engineering, College of Engineering, University of Tehran, ایران, islamic azad university, Department of Industrial Engineering, Islamic Azad University of Qazvin, ایران, amirkabir university of technology, Department of Industrial Engineering, Amirkabir University of Technology, ایران
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved