>
Fa
  |  
Ar
  |  
En
  
scientia iranica
  
سال:2013 - دوره:20 - شماره:3
  
 
A genetic algorithm for mode identity and the resource constrained project scheduling problem
- صفحه:824-831
  
 
A hybrid simulated annealing based heuristic for solving the location-routing problem with fuzzy demands
- صفحه:919-930
  
 
A multi-mode resource-constrained discrete timecost tradeoff problem solving using an adjusted fuzzy dominance genetic algorithm
- صفحه:931-944
  
 
A type-2 fuzzy system model for reducing bullwhip effects in supply chains and its application in steel manufacturing
- صفحه:879-899
  
 
An MLE approach for estimating the time of step changes in Poissonregression profiles
- صفحه:855-860
  
 
An imperfect multi-product production system with rework
- صفحه:811-823
  
 
Analyzing price, warranty length, and service capacity under a fuzzy environment: Genetic algorithm and fuzzy system
- صفحه:975-982
  
 
Bi-objective simulated annealing approaches for no-wait two-stage flexible flow shop scheduling problem
- صفحه:861-872
  
 
ERP success prediction: An artificial neural network approach
- صفحه:992-1001
  
 
Estimation of the mean of a socially undesirable characteristic
- صفحه:839-845
  
 
Finding the optimum location in a one-median network problem with correlated demands using simulated annealing
- صفحه:793-800
  
 
Grey stochastic multi-criteria decision-making approach based on expected probability degree
- صفحه:873-878
  
 
Inventory competition in a multi channel distribution system: The Nash and Stackelberg game
- صفحه:846-854
  
 
Linear and nonlinear estimation of the cost function of a two-echelon inventory system
- صفحه:801-810
  
 
Multi-objective genetic algorithm for economic statistical design of X control chart
- صفحه:909-918
  
 
Multi-pass turning process parameter optimization using teachinglearning-based optimization algorithm
- صفحه:967-974
  
 
Optimal topological design of power communication networks using genetic algorithm
- صفحه:945-957
  
 
Statistical monitoring of polytomous logistic profiles in phase II
- صفحه:958-966
  
 
The effects of machine breakdown on hull structure production process
- صفحه:900-908
  
 
The incomplete hub-covering location problem considering imprecise location of demands
- صفحه:938-991
  
 
Two metaheuristics for solving the reliability redundancy allocation problem to maximize mean time to failure of a seriesparallel system
- صفحه:832-838
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved