>
Fa
  |  
Ar
  |  
En
  
scientia iranica
  
سال:2010 - دوره:17 - شماره:1
  
 
A Corporate Supply Optimizer with Flow Network
- صفحه:70-83
  
 
A Heuristic Algorithm and a Lower Bound for the Two-Echelon Location-Routing Problem with Soft Time Window Constraints
- صفحه:36-47
  
 
A Hybrid Electromagnetism-Like Algorithm for Supplier Selection in Make-to-Order Planning
- صفحه:1-11
  
 
An Analytic Variable Limit np Control Chart
- صفحه:48-57
  
 
Economic Production Quantity Model with Scrapped Items and Limited Production Capacity
- صفحه:58-69
  
 
Phase II Monitoring of Autocorrelated Polynomial Profiles in AR(1) Processes
- صفحه:12-24
  
 
Resource-Constrained Project Scheduling Problem with Flexible Work Profiles: A Genetic Algorithm Approach
- صفحه:25-35
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved