>
Fa
  |  
Ar
  |  
En
  
journal of optimization in industrial engineering
  
سال:2009 - دوره:2 - شماره:3
  
 
A Hybrid Meta-Heuristic Method to Optimize Bi-Objective Single Period Newsboy Problem with Fuzzy Cost and Incremental Discount
- صفحه:1-13
  
 
A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times
- صفحه:39-44
  
 
A Memetic Algorithm for Hybrid Flowshops with Flexible Machine Availability Constraints
- صفحه:59-64
  
 
A New Approach in Job Shop Scheduling: Overlapping Operation
- صفحه:25-32
  
 
An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time
- صفحه:33-37
  
 
New Heuristic Algorithms for Solving Single-Vehicle and Multi-Vehicle Generalized Traveling Salesman Problems (GTSP)
- صفحه:49-58
  
 
Propagation Models and Fitting Them for the Boolean Random Sets
- صفحه:45-48
  
 
Using Markov Chain to Analyze Production Lines Systems with Layout Constraints
- صفحه:15-23
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved