>
Fa   |   Ar   |   En
   An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time  
   
نویسنده Naderi Bahman ,Zandieh Mostafa ,Fatemi Ghomi Mohammad Taghi
منبع journal of optimization in industrial engineering - 2009 - دوره : 2 - شماره : 3 - صفحه:33 -37
چکیده    This paper explores the flexile flow lines where setup times are sequence- dependent. the optimization criterion is the minimization of total weighted completion time. we propose an iterated greedy algorithm (iga) to tackle the problem. an experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of iga are compared against those of some other existing algorithms. the effectiveness of iga is demonstrated through comparison.
کلیدواژه scheduling ,flexible flow line ,sequence dependent setup time ,iterated greedy algorithm
آدرس amirkabir university of technology, Department of Indusrial Engineering, ایران, shahid beheshti university, Department of Industrial Management, ایران, amirkabir university of technology, Department of Indusrial Engineering, ایران
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved