>
Fa
  |  
Ar
  |  
En
  
journal of intelligent manufacturing
  
سال:2018 - دوره:29 - شماره:5
  
 
A Petri net-based particle swarm optimization approach for scheduling deadlock-prone flexible manufacturing systems
- صفحه:1083-1096
  
 
A bi-objective genetic algorithm for intelligent rehabilitation scheduling considering therapy precedence constraints
- صفحه:973-988
  
 
An efficient chaotic based PSO for earliness/tardiness optimization in a batch processing flow shop scheduling problem
- صفحه:1063-1081
  
 
An ontology supported risk assessment approach for the intelligent configuration of supply networks
- صفحه:1005-1030
  
 
Artificial intelligence for automatic prediction of required surface roughness by monitoring wear on face mill teeth
- صفحه:1045-1061
  
 
Contribution of angular measurements to intelligent gear faults diagnosis
- صفحه:1115-1131
  
 
Enhanced shuffled frog-leaping algorithm for solving numerical function optimization problems
- صفحه:1133-1153
  
 
Intelligent information sharing among manufacturers in supply networks: supplier selection case
- صفحه:1097-1113
  
 
Modeling truck scheduling problem at a cross-dock facility through a bi-objective bi-level optimization approach
- صفحه:1155-1170
  
 
Reconfiguration point decision method based on dynamic complexity for reconfigurable manufacturing system (RMS)
- صفحه:1031-1043
  
 
Single machine interfering jobs problem with flowtime objective
- صفحه:953-972
  
 
The dominance-based rough set approach to cylindrical plunge grinding process diagnosis
- صفحه:989-1004
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved