>
Fa   |   Ar   |   En
   A constraint programming model for the scheduling of JIT cross-docking systems with preemption  
   
نویسنده Zarandi M. H. Fazel ,Khorshidian H. ,Shirazi M. Akbarpour
منبع journal of intelligent manufacturing - 2016 - دوره : 27 - شماره : 2 - صفحه:297 -313
چکیده    In this paper, a scheduling problem of minimizing the total of the earliness, tardiness and the number of preemption for the outbound trucks on a cross-dock system is considered. this problem, which is known to be np-hard, is compatible with the concepts of just-in-time (jit) production and supply chain management. a new multi-criteria model, with non-linear terms and integer variables, which cannot be solved efficiently for large sized problems, is proposed. this paper also shows how to map a jit cross-dock model to a constraint satisfaction problem (csp) and integer programming (ip). to solve the model for real size applications, a genetic algorithm (ga) is applied. finally, a computational experiment is carried out to analyze the performances of csp, ga and ip models with respect to modeling capability, solution quality and time.
کلیدواژه Cross-docking system ,Just-in-time scheduling ,Preemption ,Constraint satisfaction problem ,Genetic algorithm
آدرس Amirkabir University of Technology, Department of Industrial Engineering, Iran, Amirkabir University of Technology, Department of Industrial Engineering, Iran, Amirkabir University of Technology, Department of Industrial Engineering, Iran
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved