>
Fa
  |  
Ar
  |  
En
  
journal of industrial engineering international
  
سال:2009 - دوره:5 - شماره:8
  
 
A weighted metric method to optimize multi-response robust problems
- صفحه:10-19
  
 
EPQ model with depreciation cost and process quality cost as continuous functions of time
- صفحه:77-89
  
 
Flexible job shop scheduling under availability constraints
- صفحه:52-60
  
 
Multi-factor failure mode critically analysis using TOPSIS
- صفحه:1-9
  
 
Policy options for value added to different levels of production
- صفحه:61-70
  
 
Solving the tandem AGV network design problem using tabu search: Cases of maximum workload and workload balance with fixed and non-fixed number of loops
- صفحه:37-51
  
 
Study on implementation of one-piece lean line design using simulation techniques: A practical approach
- صفحه:20-36
  
 
The optimal number of yard cranes in container terminal
- صفحه:71-76
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved