>
Fa
  |  
Ar
  |  
En
  
journal of industrial engineering international
  
سال:2015 - دوره:11 - شماره:2
  
 
(m, M) Machining system with two unreliable servers, mixed spares and common-cause failure
- صفحه:171-178
  
 
A hybrid solution approach for a multi-objective closed-loop logistics network under uncertainty
- صفحه:237-252
  
 
A stochastic model for operating room planning under uncertainty and equipment capacity constraints
- صفحه:269-279
  
 
Developing a cross-docking network design model under uncertain environment
- صفحه:225-236
  
 
Joint pricing and production management: a geometric programming approach with consideration of cubic production cost function
- صفحه:209-223
  
 
Qualitative and quantitative approaches to analyse reliability of a mechatronic system: a case
- صفحه:253-268
  
 
Retailer’s inventory system in a two-level trade credit financing with selling price discount and partial order cancelations
- صفحه:159-170
  
 
Roadmap for Lean implementation in Indian automotive component manufacturing industry: comparative study of UNIDO Model and ISM Model
- صفحه:179-198
  
 
Robust DEA under discrete uncertain data: a case study of Iranian electricity distribution companies
- صفحه:199-208
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved