|
|
Application of TPM indicators for analyzing work time of machines used in the pressure die casting
|
|
|
|
|
نویسنده
|
Borkowski Stanis?aw ,Czajkowska Agnieszka ,Stasiak-Betlejewska Renata ,Borade B. Atul
|
منبع
|
journal of industrial engineering international - 2014 - دوره : 10 - شماره : 2 - صفحه:1 -9
|
چکیده
|
The article presents the application of total productive maintenance (tpm) to analyze the working time indicators of casting machines with particular emphasis on failures and unplanned downtime to reduce the proportion of emergency operation for preventive maintenance and diagnostics. the article presents that the influence of individual factors of complex machinery maintenance (tpm) is different and depends on the machines’ modernity level. in an original way, by using correlation graphs, research findings on the impact of individual tpm factors on the castings quality were presented and interpreted. the examination results conducted for machines with varying modernity degrees allowed to determine changes within the impact of individual tpm factors depending on machine parameters. these results provide a rich source of information for the improvement processes on casting quality of the foundry industry that satisfies the automotive industry demand.
|
کلیدواژه
|
TPM ,Pressure die casting ,The correlation coefficient ,Quality
|
آدرس
|
Czestochowa University of Technology, Institute of Production Engineering, Poland, Cz?stochowa, Poland, Poland, Kielce University of Technology, Faculty of Civil and Architecture, Poland, Kielce, Poland, Poland, Czestochowa University of Technology, Institute of Production Engineering, Poland, Cz?stochowa, Poland, Poland, Jawaharlal Darda Institute of Engineering and Technology, Mechanical Engineering Department, Maharashtra, India, India
|
پست الکترونیکی
|
atulborade@rediffmail.com
|
|
|
|
|
|
|
|
|
|
|
|
Authors
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|