>
Fa
  |  
Ar
  |  
En
  
journal of industrial engineering international
  
سال:2010 - دوره:6 - شماره:11
  
 
A graphical instrument for performance analysis of contractors
- صفحه:31-38
  
 
A profit Malmquist productivity index
- صفحه:23-30
  
 
A redundancy allocation problem with the choice of redundancy strategies by a memetic algorithm
- صفحه:6-16
  
 
Assembly line balancing to minimize balancing loss and system loss
- صفحه:1-5
  
 
Determining maintenance system requirements by viewpoint of availability and lean thinking: A MODM approach
- صفحه:65-75
  
 
Dynamic modeling to determine production strategies in order to maximize net present worth in small and medium size companies
- صفحه:51-64
  
 
Fuzzy completion time for alternative stochastic networks
- صفحه:17-22
  
 
Yard crane scheduling in port container terminals using genetic algorithm
- صفحه:39-50
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved