>
Fa   |   Ar   |   En
   journal of industrial engineering international   
سال:2018 - دوره:14 - شماره:1


  tick  a meta-heuristic approach supported by nsga-ii for the design and plan of supply chain networks considering new product development - صفحه:95-109

  tick  an enhanced reliability-oriented workforce planning model for process industry using combined fuzzy goal programming and differential evolution approach - صفحه:185-212

  tick  analysis of interactions among barriers in project risk management - صفحه:153-169

  tick  availability analysis of mechanical systems with condition-based maintenance using semi-markov and evaluation of optimal condition monitoring interval - صفحه:119-131

  tick  designing a capacitated multi-configuration logistics network under disturbances and parameter uncertainty: a real-world case of a drug supply chain - صفحه:65-85

  tick  integrated model for pricing, delivery time setting, and scheduling in make-to-order environments - صفحه:55-64

  tick  multiple utility constrained multi-objective programs using bayesian theory - صفحه:111-118

  tick  optimal (r, q) policy and pricing for two-echelon supply chain with lead time and retailer’s service-level incomplete information - صفحه:43-53

  tick  optimal replenishment and credit policy in supply chain inventory model under two levels of trade credit with time- and credit-sensitive demand involving default risk - صفحه:31-42

  tick  phase-i monitoring of standard deviations in multistage linear profiles - صفحه:133-142

  tick  shrinkage simplex-centroid designs for a quadratic mixture model - صفحه:87-93

  tick  solving the competitive facility location problem considering the reactions of competitor with a hybrid algorithm including tabu search and exact method - صفحه:171-183

  tick  solving the flexible job shop problem by hybridmetaheuristics-based multiagent model - صفحه:1-14

  tick  two phase genetic algorithm for vehicle routing and scheduling problem with cross-docking and time windows considering customer satisfaction - صفحه:15-30

  tick  vacation model for markov machine repair problem with two heterogeneous unreliable servers and threshold recovery - صفحه:143-152
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved