>
Fa
  |  
Ar
  |  
En
  
journal of industrial and systems engineering
  
سال:2016 - دوره:9 - شماره:3
  
 
A hybrid modified meta-heuristic algorithm for solving the traveling salesman problem
- صفحه:57-69
  
 
A multi commodity pickup and delivery open tour m-TSP formulation for bike sharing rebalancing problem
- صفحه:70-81
  
 
Benders’ decomposition algorithm to solve bi-level bi-objective scheduling of aircrafts and gate assignment under uncertainty
- صفحه:111-126
  
 
Demand-oriented timetable design for urban rail transit under stochastic demand
- صفحه:28-56
  
 
Economical-Statistical Design of One- Sided CCC-r Control chart based on Analytical Hierarchy Process
- صفحه:127-145
  
 
Improvement of Project Management Office Performance: An Empirical Investigation of Effective Factors in Iranian Construction Industry
- صفحه:146-164
  
 
Interval valued hesitant fuzzy method based on group decision analysis for estimating weights of decision makers
- صفحه:96-110
  
 
Multi-objective routing and scheduling for relief distribution with split delivery in post-disaster response
- صفحه:17-27
  
 
Truck scheduling problem in a cross-docking system with release time constraint
- صفحه:1-16
  
 
Using data envelopment analysis (DEA) to improve the sales performance in Iranian agricultural clusters by utilizing business networks and business development services providers (BDSPs)
- صفحه:82-95
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved