   Budgetary Constraints and Idle Time Allocation in Common-Cycle Production with non-zero Setup Time  
   
نویسنده Haji Rasoul ,Haji Alireza ,Ardalan Ali
منبع journal of industrial and systems engineering - 2010 - دوره : 4 - شماره : 1 - صفحه:18 -32
چکیده    Economic lot size scheduling problem (elsp) for a multi-product single machine system is aclassical problem. this paper considers elsp with budgetary constraint as an important aspect ofsuch systems. in the real world situations the available funds for investment in inventory is limited.by adopting the common cycle time approach to elsp, we obtain the optimal common cycle whichminimizes the total inventory ordering and holding costs for the case of nonzero setup times. oneaspect of the scheduling is to decide what should be the sequence of production runs and how theidle times shall be distributed in the common cycle time. for such a sequencing problem, weconsider two cases: a) the common cycle time is given, and b) the common cycle time is a decisionvariable. in the literature, scheduling rules are introduced for both cases, which assume that the totalidle time is located at the end of each cycle. this paper relaxes this assumption and provides: i) arule to optimize the production sequence and the length of idle times before (or after) producingeach item, for both cases (a) and (b), and ii) the optimal common cycle for case (b). the presentedrule is interestingly general, simple and easy-to-apply.
کلیدواژه ELSP ,Sequencing ,Inventory Control
آدرس sharif university of technology, Dept of Industrial Engineering, Sharif University of Technology, ایران, sharif university of technology, Dept of Industrial Engineering, Sharif University of Technology, ایران, Old Dominion University, College of Business and Public Administration, Old Dominion University, Virginia
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved