   A branch and bound algorithm to minimize the total weighted number of tardy jobs and delivery costs with late deliveries for a supply chain-scheduling problem  
   
نویسنده rasti-barzoki morteza ,hejazi reza
منبع journal of industrial and systems engineering - 2017 - دوره : 10 - شماره : 1 - صفحه:50 -60
چکیده    In this paper, we study a supply chain scheduling problem that simultaneously considers production scheduling and product delivery. n jobs have to be scheduled on a single machine and delivered to k customers for further processing in batches. the objective is to minimize the sum of the total weighted number of tardy jobs and the delivery costs. in this paper, we present a heuristic algorithm (ha) and a branch and bound (b&b) method for the restricted case, where the tardy jobs are delivered separately, and compare these procedures with an existing dynamic programming (dp) algorithm by computational tests. the results of computational tests show significant improvement of the b&b over the dynamic programming algorithm.
کلیدواژه Supply chain scheduling ,batch delivery and tardy job ,branch and bound
آدرس isfahan university of technology, department of industrial and systems engineering, ایران, isfahan university of technology, department of industrial and systems engineering, ایران
پست الکترونیکی rehejazi@cc.iut.ac.ir
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved