>
Fa   |   Ar   |   En
   Reliability Modelling of a Computer System with Priority to H/W Repair over Replacement of H/W and Up-gradation of S/W Subject to MOT and MRT  
   
نویسنده Kumar Ashish ,Malik S.C.
منبع jordan journal of mechanical and industrial engineering - 2014 - دوره : 8 - شماره : 4 - صفحه:233 -241
چکیده    In the present paper, some reliability measures of a computer system of two cold standby identical units are obtained using a semi-markov process and a regenerative point technique. for this purpose, a reliability model is proposed by considering independent h/w and s/w failure. initially, one unit is operative and another is kept as spare in cold standby. a single server is provided to conduct preventive maintenance, repair, replacement and up-gradation of the components upon their failure. then, a maximum operation time system undergoes preventive maintenance, directly from normal mode. if the repair of the h/w is not possible by the server up to a pre-specific time, it is replaced by a new one with some replacement time. however, only up-gradation of the software by a new one is made whenever s/w fails to execute the desired function properly. priority to h/w repair is given over h/w replacement and s/w up-gradation. the failure time distribution of the h/w and s/w follows a negative exponential while the distributions of preventive maintenance, repair, up-gradation and replacement time are taken as arbitrary with different probability density functions. to depict the importance of the study, graphs are drawn for a particular case with fixed values of other parameters and costs.
کلیدواژه Computer System ,H/W and S/W Failure ,Maximum Operation and Repair Times ,Priority and Preventive Maintenance
آدرس Manipal University, Department of Mathematics, India, M.D. University, Department of Statistics, India
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved