>
Fa
  |  
Ar
  |  
En
  
international journal of supply and operations management
  
سال:2017 - دوره:4 - شماره:2
  
 
a new mathematical model for simultaneous lot-sizing and production scheduling problems considering earliness/tardiness penalties and setup costs
- صفحه:167-179
  
 
design of forward/reverse logistics with environmental consideration
- صفحه:115-132
  
 
determining of an optimal maintenance policy for three state machine replacement problem using dynamic programming
- صفحه:180-192
  
 
modeling and solving a blood supply chain network: an approach for collection of blood
- صفحه:158-166
  
 
modeling the multi-period and multi-product closedloop supply chain network design problem considering reused cost and capacity constraints
- صفحه:133-149
  
 
on solutions of possibilistic multi-objective quadratic programming problems
- صفحه:150-157
  
 
the comparison of neural networks’ structures for forecasting
- صفحه:105-114
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved