>
Fa   |   Ar   |   En
   the combinatorial multi-mode resource constrained multi-project scheduling problem  
   
نویسنده pinha denis c. ,ahluwalia rashpal s. ,senna pedro
منبع international journal of supply and operations management - 2016 - دوره : 3 - شماره : 3 - صفحه:1391 -1412
چکیده    This paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practical situations where the definition of optimal changes on a regular basis. the proposed approach empowers the project manager to determine what is optimal, on a given day, under the current constraints, such as, change of priorities, lack of skilled worker. the proposed method utilizes a simulation approach to determine feasible solutions, under the current constraints. resources can be nonconsumable, consumable, or doubly constrained. the paper also presents a real-life case study dealing with scheduling of ship repair activities.
کلیدواژه resource constrained project scheduling ,mathematical formulation ,discrete event simulation ,decision support system
آدرس west virginia university, usa, west virginia university, usa, federal center for technological education of rio de janeiro, brazil
پست الکترونیکی pedro.sennavieira@gmail.com
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved