on single machine scheduling problem with distinct due dates under fuzzy environment
|
|
|
|
|
نویسنده
|
khalifa h. a.
|
منبع
|
international journal of supply and operations management - 2020 - دوره : 7 - شماره : 3 - صفحه:272 -278
|
چکیده
|
This research article proposes a single machine scheduling problem subject to distinct due dates in fuzzy environment. the proposed problem is considered in fuzzy environment with an attempt to sequence of the 𝑛−jobs. the total penalty cost is considered as the composition of all the total earliness and tardiness cost. the aim of this research work is to minimize the total penalty cost. a method to minimize the total penalty cost due to earliness or lateness of job in fuzzy environment is proposed. a numerical example is illustrated to support the proposed method in this study.
|
کلیدواژه
|
single machine; distinct due dates; early/ lately machine problem; (𝛼 ,𝛽)− interval- valued fuzzy number; signed distance ranking
|
آدرس
|
qassim university, college of science and arts, mathematics department, saudi arabia
|
پست الکترونیکی
|
hamiden_2008@yahoo.com
|
|
|
|
|