>
Fa
  |  
Ar
  |  
En
  
international journal of supply and operations management
  
سال:2018 - دوره:5 - شماره:3
  
 
a new mathematical model for designing a municipal solid waste system considering environmentally issues
- صفحه:234-255
  
 
an adjusted water cycle algorithm for solving reliability-redundancy allocation problems with cold-standby components
- صفحه:218-233
  
 
an exploration of evolutionary algorithms for a bi-objective competitive facility location problem in congested systems
- صفحه:266-282
  
 
analytical dimension to quality check in production process through control charts
- صفحه:283-288
  
 
challenges and benefits of industry 4.0: an overview
- صفحه:256-265
  
 
how to estimate the supplier fill rate when the supply order and the supply lead-time are uncertain?
- صفحه:197-206
  
 
two-echelon supply chain model for deteriorating items in an imperfect production system with advertisement and stock dependent demand under trade credit
- صفحه:207-217
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved