>
Fa   |   Ar   |   En
   hybrid optimization of production scheduling and maintenance using mathematical programming and nsga-ii meta-heuristic method  
   
نویسنده sharifzadegan mohamad ,sohrabi tahmoores ,jafarnejad chaghoshi ahmad
منبع journal of quality engineering and production optimization - 2021 - دوره : 6 - شماره : 2 - صفحه:79 -96
چکیده    This paper presents an integrated hybrid optimization problem for production and maintenance scheduling within a comprehensive system using overall cost and reliability. the total cost consists of three parts: production costs, inventory costs, and workforce costs. this integration aims to simultaneously find the optimal value of the function in a period. using mixed-integer linear programming, the optimal values are minimized over a limited horizon in the various samples considered for different numbers of workers and machines. in order to evaluate the model in larger dimensions, the nsga-ii metaheuristic method has been used. given that the error rate of the developed mathematical model with the results of the meta-heuristic method in small dimensions can be neglected, so this meta-heuristic method has been used to perform sensitivity analysis in larger dimensions of the problem. in general, the results of this paper provide valuable information about changes in the number of workers and machines simultaneously to prevent interruptions and save on production to managers and analysts in the field of production planning.
کلیدواژه production planning ,scheduling ,maintenance ,hybrid model
آدرس islamic azad university, central tehran branch, department of management, iran, islamic azad university, central tehran branch, department of management, iran, university of tehran, faculty of management, iran
پست الکترونیکی jafarnjad@ut.ac.ir
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved