>
Fa   |   Ar   |   En
   journal of industrial engineering and management studies   
سال:2019 - دوره:6 - شماره:2


  tick  a bi-objective model for the assembly flow shop scheduling problem with sequence dependent setup times and considering energy consumption - صفحه:44-64

  tick  a new approach for solving fuzzy multi-objective quadratic programming of water resource allocation problem - صفحه:78-102

  tick  a novel multi-objective model for two-echelon green routing problem of perishable products with intermediate depots - صفحه:196-213

  tick  bio-bjective robust optimization model for configuring cellular manufacturing system with variable machine reliability and parts demand: a real case study - صفحه:120-146

  tick  cycle time reduction for productivity improvement in the manufacturing industry - صفحه:147-164

  tick  evaluation of iranian electronic products manufacturing industries using an unsupervised model, aras, saw, and dea models - صفحه:1-24

  tick  identifying and ranking effective lean production factors on economic performance of production companies in mazandaran province of iran based on fdanp approach - صفحه:65-77

  tick  integrated sourcing and inventory decisions considering sources’ disruptions with a hybrid simulation-mopso-topsis approach: a pharmaceutical case study - صفحه:103-119

  tick  measuring performance of a hybrid system based on imprecise data: modeling and solution approaches - صفحه:214-241

  tick  queuing approach and optimal inventory decisions in a stochastic supply ‎chain network design - صفحه:165-187

  tick  revenue management and seller pricing decisions in retail industry: an agent-based model - صفحه:25-43

  tick  survey factors affecting performance of industrial clusters by using panel-var model - صفحه:188-195
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved