>
Fa
  |  
Ar
  |  
En
  
روشهای تحلیلی و عددی در مهندسی معدن
  
سال:2019 - دوره:8 - شماره:17
  
 
comparing the “modified split and fender” and “shortwall” methods for the pillar recovery in room and pillar coal mining using a 3d finite difference modeling in tabas central coal mine, iran
- صفحه:27-37
  
 
discontinued rock slope analysis through a new tfskgm analytical method
- صفحه:1-18
  
 
dynamic analysis of embankments reinforced with micro-piles
- صفحه:53-61
  
 
effect of rock fracture filling on mode i and ii fracture toughness
- صفحه:19-25
  
 
effects of blast vibration on unplanned dilution in an underground metal mine
- صفحه:77-90
  
 
prioritizing preventative and repair measures of conveyor belt equipment pieces using fuzzy topsis technique (case study: pelletizing plant of golgohar mining and industrial company)
- صفحه:63-75
  
 
two-dimensional compact inversion of magnetic data in the presence of remanent magnetization
- صفحه:39-51
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved