>
Fa
  |  
Ar
  |  
En
  
روشهای تحلیلی و عددی در مهندسی معدن
  
سال:2019 - دوره:8 - شماره:17
  
 
Comparing The “Modified Split And Fender” And “Shortwall” Methods For The Pillar Recovery In Room And Pillar Coal Mining Using A 3d Finite Difference Modeling In Tabas Central Coal Mine, Iran
- صفحه:27-37
  
 
Discontinued Rock Slope Analysis Through A New Tfskgm Analytical Method
- صفحه:1-18
  
 
Dynamic Analysis Of Embankments Reinforced With Micro-Piles
- صفحه:53-61
  
 
Effect Of Rock Fracture Filling On Mode I And Ii Fracture Toughness
- صفحه:19-25
  
 
Effects Of Blast Vibration On Unplanned Dilution In An Underground Metal Mine
- صفحه:77-90
  
 
Prioritizing Preventative And Repair Measures Of Conveyor Belt Equipment Pieces Using Fuzzy Topsis Technique (Case Study: Pelletizing Plant Of Golgohar Mining And Industrial Company)
- صفحه:63-75
  
 
Two-Dimensional Compact Inversion Of Magnetic Data In The Presence Of Remanent Magnetization
- صفحه:39-51
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved