>
Fa   |   Ar   |   En
   Comparison of Unit Price Method and Unit Area Cost Method for Construction Cost Estimation  
   
نویسنده BAYRAM Savaş ,ÖCAL M. Emin ,LAPTALI ORAL Emel ,ATİŞ C. Duran
منبع journal of polytechnic - 2016 - دوره : 19 - شماره : 2 - صفحه:175 -183
چکیده    In the construction industry, increasing competition environment has led to decrease in the profit share of the projects. accordingly, importance of construction cost estimation works has been increased for both the employer and the contractor. the purpose of this study has been to determine and compare the construction cost estimations obtained by widely used databases, “unit price method” (upm) and “unit area cost method” (uacm) in turkey. for this purpose, construction data from 420 projects, which were procured in accordance with the public tender law no 4734 by the turkish ministry of environment and urbanism and completed between 2003 and 2011, were reviewed. root mean square error (rmse), mean absolute percentage error (mape) and coefficient of determination (r^2) were calculated for the comparison of actual and estimated cost values. consequently, rmse and mape values from upm were underestimated with the ratio of 13.57% and 1.73% than uacm. although upm showed better performance than the uacm, it is not at a satisfactory level.
کلیدواژه Construction Cost Estimation ,Unit Price Method ,Unit Area Cost Method
آدرس Erciyes Üniversitesi, Mühendislik Fakültesi, İnşaat Mühendisliği Bölümü, Turkey, Korkut Ata Üniversitesi, Mühendislik Fakültesi, İnşaat Mühendisliği Bölümü, Turkey, Çukurova Üniversitesi, Mühendislik-Mimarlık Fakültesi, İnşaat Mühendisliği Bölümü, Turkey, Erciyes Üniversitesi, Mühendislik Fakültesi, İnşaat Mühendisliği Bölümü, Turkey
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved