>
Fa   |   Ar   |   En
   Risk Analysis for a BOT Project  
   
نویسنده Bagui Swapan Kumar ,Ghosh Ambarish
منبع jordan journal of civil engineering - 2011 - دوره : 5 - شماره : 3 - صفحه:330 -342
چکیده    There are several risks in a bot project. major critical risks are total project cost and revenue/tollable traffic. this paper presents a sensitivity analysis for a bot project with a real case study varying equity from 10% to 90%.traffic and cost are varied ± 20% and financial analysis is carried out with spread sheet, and test results are prepared in graphical forms and presented. total project cost (tpc), net present value (npv) and financial internal rate of return (firr) are plotted with various percentages of equity. linear and non-linear graphs are found. firr decreases with increasing tpc/equity, and probability of project risk increases with increasing percentage of equity up to 30 % and decreases beyond this value
کلیدواژه Risk analysis ,BOT projects
آدرس Bengal Engineering and Science University, Department of Civil Engineering, India, Bengal Engineering and Science University, India
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved