>
Fa   |   Ar   |   En
   Investigating a claim about resource complexity measure  
   
نویسنده yousefzadeh h.r.
منبع iranian journal of numerical analysis and optimization - 2021 - دوره : 11 - شماره : 2 - صفحه:401 -405
چکیده    The utilization factor (uf) measures the ratio of the total resources’ amount required to the availability of resources’ amount during the life cycle of a project. in 1982, in the journal of management science, kurtulus and davis claimed that “if two resource-constrained problems for each type of resource have the same uf’s value in each period of time, then each problem is subjected to the same amount of delay provided that the same sequencing rule is used (if different tie-breaking rules are used, a different schedule may be obtained)”. in this paper, with a counterexample, we show that the claim of authors cannot be justified.
کلیدواژه scheduling scheme; priority rule; multi-project environment;resource measure
آدرس payame noor university (pnu), department of mathematics, iran
پست الکترونیکی usefzadeh.math@pnu.ac.ir
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved