>
Fa
  |  
Ar
  |  
En
  
international journal of research in industrial engineering
  
سال:2014 - دوره:3 - شماره:3
  
 
A Method for Evaluating Project Management Standards, Based on EFQM Criteria, Using FTOPSIS Method
- صفحه:1-12
  
 
An ERP Selection Combination Model under Uncertainty: A Grey-BSC-AHP-Entropy Model
- صفحه:13-23
  
 
Carbon Based Closed-Loop Supply Chain Design under Uncertainty using an Interval-Valued Fuzzy Stochastic Programming Approach
- صفحه:24-48
  
 
Optimal Design of PM Synchronous Generator for Aerial Industries Power Supply Using Cuckoo Algorithm
- صفحه:49-68
  
 
Ranking Decision Making Units with Negative and Positive Input and Output
- صفحه:69-74
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved