>
Fa
  |  
Ar
  |  
En
  
International Journal Of Research In Industrial Engineering
  
سال:2013 - دوره:2 - شماره:3
  
 
Application Of Fuzzy Hybrid Analytic Network Process In Equipment Selection Of Open-Pit Metal Mines
- صفحه:35-46
  
 
Fuzzy Big-M Method For Solving Fuzzy Linear Programs With Trapezoidal Fuzzy Numbers
- صفحه:1-9
  
 
Minimizing Total Resource Tardiness Penalty Costs In The Resource Constrained Project Scheduling Problem With Metaheuristic Algorithms
- صفحه:47-57
  
 
Solving Fuzzy Step Fixed Charge Transportation Problems Via Metaheuristics
- صفحه:24-34
  
 
The 5s Strategy By Using Pdca Cycle For Continuous Improvement Of The Manufacturing Processes In Agriculture Industry
- صفحه:10-23
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved