>
Fa
  |  
Ar
  |  
En
  
international journal of research in industrial engineering
  
سال:2019 - دوره:8 - شماره:2
  
 
a simulated annealing optimization algorithm for equal and un-equal area construction site layout problem
- صفحه:89-104
  
 
application of total productive maintenance in service organization
- صفحه:176-186
  
 
development of a maintenance schedule plan to improve the equipment efficiency of an industry: a case study
- صفحه:140-157
  
 
ergonomic furniture design for secondary girls school in bangladesh
- صفحه:187-202
  
 
evaluation of iranian automotive industries
- صفحه:115-139
  
 
excessive sound noise risk assessment in textile mills of an ethiopian-kombolcha textile industry share company
- صفحه:105-114
  
 
ranking efficient dmus using the tchebycheff norm with fuzzy data in dea
- صفحه:158-175
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved