   scheduling project crashing time using linear programming approach: case study  
   
نویسنده chitra c. l. ,halder p.
منبع international journal of research in industrial engineering - 2017 - دوره : 6 - شماره : 4 - صفحه:283 -292
چکیده    In today’s competitive environment completing a project within time and budget, is very challenging task for the project managers. this aim of this study is to develop a model that finds a proper tradeoff between time and cost to expedite the execution process. critical path method (cpm) is used to determine the longest duration and cost required for completing the project and then the time-cost trade–off problem (tctp) is formulated as a linear programming model. here, lindo program is used to determine the solution of the model. to implement the proposed model, necessary data were collected through interviews and direct discussion with the project managers of chowdhury construction company, dhaka, bangladesh. the analysis reveals that through proper scheduling of all activities, the project can be completed within 120 days from estimated duration of 140 days. reduction of project duration by 17% is achieved by increasing cost by 3.73%, which is satisfactory.
کلیدواژه linear programming ,critical path method ,trade-off analysis ,crashing
آدرس jessore university of science and technology, department of industrial and production engineering, bangladesh, jessore university of science and technology, department of industrial and production engineering, australia
پست الکترونیکی pobitra.halder@gmail.com
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved