Extensive research has been devoted to resource constrained project scheduling problem (rcpsp). resources are renewable and there is a unique way to perform the activities. this work develops a population based evolutionary algorithm namely differential evolution (de) to schedule project activities to minimize makespan subject to precedence constraints and resources availability. the proposed de uses a priority value based representation to encode a project schedule and a serial generation scheme to obtain the schedule. the de algorithm is compared with some existing algorithms available in the literature on the basis of a computational experiment performed on patterson’s test bed. obtained results show that the performance of the proposed de is quite satisfactory.
|
کلیدواژه
|
Project scheduling;Resource constraints;Differential evolution;Makespan minimization
|
آدرس
|
Islamic Azad University, Qazvin Branch, Faculty of Industrial and Mechanical Engineering, ایران, Islamic Azad University, Qazvin Branch, Faculty of Industrial and Mechanical Engineering, ایران, Islamic Azad University, Qazvin Branch, Faculty of Industrial and Mechanical Engineering, ایران, Islamic Azad University, Qazvin Branch, Faculty of Industrial and Mechanical Engineering, ایران
|
پست الکترونیکی
|
somayeh_kh81@yahoo.com
|
|
|
|
|
|
|
|
|
|
|
|
Authors
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|