Eects of welding operating factor on shipyard panel lines production quantity
|
|
|
|
|
نویسنده
|
Ozkok M.
|
منبع
|
scientia iranica - 2013 - دوره : 20 - شماره : 6- B - صفحه:1773 -1780
|
چکیده
|
Welding processes play a major role in ship production. if the weldingprocess can be performed in less time, ship fabrication can be completed in a shorter time.therefore, it is a signicant issue for welding time to be ended as soon as possible. for this,the operator factor, which is a component of welding time calculation, could be increased.if this is done, welding time could be decreased. the purpose of this study is to determinethe eects of operator factor on the production quantity of a panel line. here, the panel lineof a shipyard situated in turkey was illustrated as an example. whole workstations of apanel line were taken into consideration and modeled in a simio simulation environment.by changing the operator factor in a web welding work station on a panel line, dierentwelding time values were achieved. these welding time values were then inserted into asimulation model and the model was run for a specied period. finally, the productionquantities of the panel line were obtained as an output. thus, the eects of a changingoperator factor on panel line throughput were determined.
|
کلیدواژه
|
Operator factor; ,Welding time; ,Web welding; ,Panel line; ,Simulation.
|
آدرس
|
Karadeniz Technical University, PhD degrees from the Naval Architecture Department at Istanbul Technical University,, Turkey
|
پست الکترونیکی
|
muratozkok@ktu.edu.tr
|
|
|
|
|
|
|
|
|
|
|
|
Authors
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|