>
Fa   |   Ar   |   En
   fuzzy mathematical models for maximizing satisfaction of contractors and clients by considering flexible start date of the project  
   
نویسنده zare m. ,hadi-vencheh a. ,khazaeli f. ,arman h.
منبع scientia iranica - 2022 - دوره : 29 - شماره : 3-E - صفحه:1729 -1741
چکیده    Resource-constrained multi-project scheduling problem (rcmpsp) is considered a significant topic in project management studies and many kinds of research have been carried out in this field which have been proposed numerous approaches. however, in most of them, the viewpoints of clients and contractors, two important stakeholders of the project are not directly considered. the current research tries to introduce a new approach of rcmpsp in order to schedule the project portfolio and allocate the budget as a limited resource simultaneously. in this way, first, the client’s and contractors’ budget satisfaction is defined. then some budget allocation models have been proposed to maximize the clients’ and the contractors’ satisfaction. these models consider constraints such as the minimum cost required for each project, the maximum budget for each period, and the flexibility for the start date of each project. to illustrate the proposed models, a real case of the project portfolio is considered.
کلیدواژه budget allocation ,satisfaction ,fuzzy linear programming ,project management ,resource-constrained multi-project scheduling problem
آدرس islamic azad university, najafabad branch, department of civil engineering, iran, islamic azad university, isfahan (khorasgan) branch, department of mathematics, iran, islamic azad university, najafabad branch, department of civil engineering, iran, islamic azad university, najafabad branch, department of management, iran
پست الکترونیکی hosein.arman@yahoo.com
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved