|
|
mathematical models and an elephant herding optimization for multiprocessor-task flexible flow shop scheduling problems in the manufacturing resource planning (mrpii) system
|
|
|
|
|
نویسنده
|
mehdizadeh e. ,gholami h.r. ,naderi b.
|
منبع
|
scientia iranica - 2020 - دوره : 27 - شماره : 3-E - صفحه:1562 -1571
|
چکیده
|
Shop floor control (sfc) is one of the main concepts in manufacturing resource planning (mrpii) and production scheduling is a key element in sfc. this paper studies the hybrid flow shop scheduling problem where jobs are multiprocessor. the objective is to minimize total completion time. although there are several papers considering hybrid flow-shop scheduling problem with multiprocessor tasks, but none propose a mathematical model for this problem. at first, the two problems (fixed and selective cases) are mathematically formulated by mixed integer linear programming models. using commercial software, the model is used to solve the small instances of the problems. moreover, an elephant herding optimization is developed to solve large instances of the problems. to numerically evaluate the proposed algorithm, it is compared with two available algorithms in the literature, simulated annealing and shuffled frog-leaping algorithm in the literature.
|
کلیدواژه
|
hybrid ow shop ,multiprocessor jobs ,mathematical modeling ,elephant herding optimization ,manufacturing resource planning (mrpii)
|
آدرس
|
islamic azad university, qazvin branch, faculty of industrial and mechanical engineering, iran, islamic azad university, qazvin branch, faculty of industrial and mechanical engineering, iran, kharazmi university, faculty of engineering, department of industrial engineering, iran
|
پست الکترونیکی
|
bahman.naderi@aut.ac.ir
|
|
|
|
|
|
|
|
|
|
|
|
Authors
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|