|
|
hybrid fuzzy-stochastic approach to multi-product, multi-period, and multi-resource master production scheduling problem: case of a polyethylene pipe and fitting manufacturer
|
|
|
|
|
نویسنده
|
hashemi sh. sadat ,sadeghi m. ,razavi hajiagha s.h.
|
منبع
|
scientia iranica - 2019 - دوره : 26 - شماره : 3-E - صفحه:1809 -1823
|
چکیده
|
Master production scheduling is an effective phase of production planning, which ends in production scheduling and magnitude of different products in a company. this problem requires investigating a wide range of parameters, regarding demand, manufacturing resource usage, and costs. uncertainty is an intrinsic characteristic of these parameters. in this paper, a model is developed for master production scheduling under uncertainty, in which demands, as time-dependent variables, are considered as stochastic variables, while cost and utilization parameters, with cognitive ambiguity, are expressed as fuzzy numbers. a hybrid approach is also proposed to solve the extended model. the application of the proposed method is examined in a practical problem of a polyethylene pipe and fitting co. in iran. the result showed a high degree of applicability.
|
کلیدواژه
|
master production scheduling ,stochastic demand ,chance constrained programming ,fuzzy set theory
|
آدرس
|
saramadan andishe avina co., department of management, iran, allameh tabatabaei university, faculty of management and accounting, industrial management group, iran, khatam university, department of management, iran
|
پست الکترونیکی
|
s.hossein.r@gmail.com; h.razavi@khatam.ac.ir
|
|
|
|
|
|
|
|
|
|
|
|
Authors
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|