|
|
applying a change-point control chart based on likelihood ratio to supply chain network monitoring
|
|
|
|
|
نویسنده
|
hu x. ,tu y. ,zhong j. ,yang y.
|
منبع
|
scientia iranica - 2020 - دوره : 27 - شماره : 5-E - صفحه:2529 -2538
|
چکیده
|
In this paper, a supply chain network system is viewed as a serial-parallel multistage process; and the application of a change point control chart based on likelihood ratio is explored to monitor this system. firstly, state-space modeling is used to characterize complexity of the supply chain network system. then, a change point control chart based on likelihood ratio is built to trigger potential tardy orders in the system. a case study is illustrated to indicate that the change point control charts can effectively signal process mean shift, and accurately estimate the change point and the out-of-control stage in term of power of detection and the accuracy of estimation of change point. we also investigate the effect of misspecified parameters of state space equations on the performance of the change point control chart. the results show that the performance of the change point control chart is relatively stable.
|
کلیدواژه
|
supply chain network system ,a serial-parallel multistage process ,order completion time ,state-space modeling ,a change-point chart based on likelihood ratio
|
آدرس
|
nanjing university of posts and telecommunications, school of management, china, university of calgary, department of mechanical and manufacturing engineering, canada, fujian agriculture and forestry university, college of management & college of tourism, china, nanjing university of science and technology, department of management science and engineering, china
|
پست الکترونیکی
|
9929428262@qq.com
|
|
|
|
|
|
|
|
|
|
|
|
Authors
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|