>
Fa   |   Ar   |   En
   Bi-criteria Three Stage Fuzzy Flowshop Scheduling with Transportation Time and Job Block Criteria  
   
نویسنده Aggarwal S ,Gupta D ,Sharma S
منبع international journal of applied operational research - 2013 - دوره : 3 - شماره : 1 - صفحه:41 -53
چکیده    Scheduling is an enduring process where the existence of real time information frequentlyforces the review and modification of pre-established schedules. the real world is complex andcomplexity generally arises from uncertainty. from this prospective the concept of fuzziness isintroduced in the field of scheduling. the present paper pertains to a bi-criterion in n-jobs, threemachines flowshop scheduling to minimize the makespan and the rental cost of the machines taken onrent under a specified rental policy in which processing time, transportation time are in fuzzyenvironment and are represented by triangular fuzzy membership function. further, the concept of jobblock to represent the relative importance of some jobs over other is also introduced. a heuristicalgorithm to find optimal or near optimal sequence optimizing the bi-criteria is discussed. anumerical illustration is given to demonstrate the computational efficiency of proposed algorithm.
کلیدواژه Flowshop Scheduling ,Fuzzy Processing Time ,Fuzzy Transportation Time ,Equivalent Job ,Rental Cost ,Utilization Time
آدرس Maharishi Markandeshwar University, Mullana, Harya, Research Scholar, Department of Mathematics, India, Maharishi Markandeshwar University, Mullana, Harya, Prof & Head, Department of Mathematics, India, D.A.V.College, Jalandhar, Punjab, Assistant Prof, Department of Mathematics, India
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved