>
Fa
  |  
Ar
  |  
En
  
international journal of engineering
  
سال:2008 - دوره:21 - شماره:4
  
 
A BASIC PERIOD APPROACH FOR SOLVING THE ECONOMIC LOT AND DELIVERY SCHEDULING IN FLEXIBLE FLOW LINES.
- صفحه:361-374
  
 
A CHANCE CONSTRAINED INTEGER PROGRAMMING MODEL FOR OPEN PIT LONG-TERM PRODUCTION PLANNING.
- صفحه:407-418
  
 
A NEW BI-OBJECTIVE MODEL FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS AND FOUR PAYMENT MODELS.
- صفحه:347-360
  
 
APPLICATION OF THE SCHWARZ-CHRISTOFFEL TRANSFORMATION IN SOLVING TWO-DIMENSIONAL TURBULENT FLOWS IN COMPLEX GEOMETRIES.
- صفحه:397-406
  
 
MATHEMATICAL MODELING OF THE TEMPERATURE-DEPENDENT GROWTH OF LIVING SYSTEMS.
- صفحه:319-328
  
 
SUBSTRUCTURE MODEL FOR CONCRETE BEHAVIOR SIMULATION UNDER CYCLIC MULTIAXIAL LOADING.
- صفحه:329-346
  
 
THERMAL CONVECTION OF ROTATING MICROPOLAR FLUID IN HYDROMAGNETICS SATURATING A POROUS MEDIUM.
- صفحه:375-396
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved