>
Fa
  |  
Ar
  |  
En
  
International Journal Of Engineering
  
سال:2008 - دوره:21 - شماره:4
  
 
A Basic Period Approach For Solving The Economic Lot And Delivery Scheduling In Flexible Flow Lines.
- صفحه:361-374
  
 
A Chance Constrained Integer Programming Model For Open Pit Long-Term Production Planning.
- صفحه:407-418
  
 
A New Bi-Objective Model For A Multi-Mode Resource-Constrained Project Scheduling Problem With Discounted Cash Flows And Four Payment Models.
- صفحه:347-360
  
 
Application Of The Schwarz-Christoffel Transformation In Solving Two-Dimensional Turbulent Flows In Complex Geometries.
- صفحه:397-406
  
 
Mathematical Modeling Of The Temperature-Dependent Growth Of Living Systems.
- صفحه:319-328
  
 
Substructure Model For Concrete Behavior Simulation Under Cyclic Multiaxial Loading.
- صفحه:329-346
  
 
Thermal Convection Of Rotating Micropolar Fluid In Hydromagnetics Saturating A Porous Medium.
- صفحه:375-396
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved