>
Fa   |   Ar   |   En
   Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines With Unrelated Parallel Machines and Sequence Dependent Setups  
   
نویسنده Jenabi M ,Fatemi Ghomi S. M. T. ,Torabi S A
منبع International Journal Of Engineering - 2008 - دوره : 21 - شماره : 2 - صفحه:143 -158
فایل تمام متن
چکیده    This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (ffl) and delivers them directly to an assembly facility (af). the objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage. we have developed a new mixed zero-one nonlinear mathematical model for the problem. due to the difficulty of obtaining the optimal solution, especially in the instances of medium and large-sized problems, two meta-heuristic algorithms (hga and sa) are proposed and evaluated over randomly generated problems. computational results indicate that the proposed hga outperforms the sa algorithm with respect to both the solution quality and computation times especially in large-size problems.
کلیدواژه Flexible Flow Lines ,Lot And Delivery-Scheduling ,Unrelated Parallel Machines ,Finite Planning Horizon ,Hybrid Genetic Algorithm ,Simulated Annealing
آدرس Amirkabir University Of Technology, Department Of Industrial Engineering, ایران, Amirkabir University Of Technology, Department Of Industrial Engineering, ایران, University Of Tehran, Department Of Industrial Engineering, Faculty Of Engineering, ایران
پست الکترونیکی satorabi@ut. ac. ir
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved