>
Fa   |   Ar   |   En
   international journal of engineering   
سال:2015 - دوره:28 - شماره:6


  tick  A Common Weight Data Envelopment Analysis Approach for Material Selection - صفحه:913-921

  tick  A MEMS Capacitive Microphone Modelling for Integrated Circuits - صفحه:888-895

  tick  A New Approach for Determination of Neck-Pore Size Distribution of Porous Membranes via Bubble Point Data - صفحه:823-831

  tick  A Numerical Investigation on Aerodynamic Coefficients of Solar Troughs Considering Terrain Effects and Vortex Shedding - صفحه:940-948

  tick  Batch Kinetics and Modeling of Alkaline Protease Production by Isolated Bacillus sp. - صفحه:841-847

  tick  Comparison of the Progressive Collapse Resistance of Seismically Designed Steel Shear Wall Frames And Special Steel Moment Frames - صفحه:871-879

  tick  Comprehensive Decision Modeling of Reverse Logistics System: A Multi-criteria Decision Making Model Using Hybrid Evidential Reasoning Approach and TOPSIS - صفحه:922-931

  tick  Improved Behaviour of Accordion Metallic Dampers Affected by the Increasing Number of Layers - صفحه:864-870

  tick  Improving Dark Channel Prior for Single Image Dehazing - صفحه:880-887

  tick  Influence of Different Fillers on Natural Rubber Composites to Assess Mechanical Performance - صفحه:932-939

  tick  Investigation of Carbon Dioxide Adsorption on Amino-Functionalized Mesoporous Silica - صفحه:848-854

  tick  Microwave Pretreatment of Fresh Water Hyacinth (Eichhornia crassipes) in Batch Anaerobic Digestion Tank - صفحه:832-840

  tick  Numerical Simulation of Cavitation in Mixed Flow Pump - صفحه:956-963

  tick  Phosphorus Removal from Dairy Wastewater in Batch Systems under Simultaneous Aerobic/Anaerobic Conditions: Application of Response Surface Methodology - صفحه:855-863

  tick  Pollutants Emissions of Filling Stations and Their Impact on the Air Quality - صفحه:949-955

  tick  Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches - صفحه:896-902

  tick  Solving Re-entrant No-wait Flowshop Scheduling Problem - صفحه:903-912
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved