>
Fa   |   Ar   |   En
   a constraint programming approach to solve multi-skill resource-constrained project scheduling problem with calendars  
   
نویسنده nikaeen r. ,najafi a. a.
منبع international journal of engineering - 2022 - دوره : 35 - شماره : 8 - صفحه:1579 -1587
چکیده    The multi-skill resource constrained project scheduling is an important and challenging problem in project management. two key issues that turn this topic into a challenging problem are the assumptions that are considered to approximate the model to a real-world problem and exact solution approach for the model. in this paper, we deal with this two issues. to consider real-word situations, we take into account calendars specifying time intervals during which the resources are available. we proposed a constraint programming approach to solve the problem exactly. the problem with and without resource calendars are modeled with mathematical programming (mp) and constraint programming (cp). in addition, the performance of cp approach is evaluated by comparing time-indexed model (tim) and branch and price (b&p) approaches. computational results show that the proposed approach can efficiently solve real-size instances.
کلیدواژه multi-skill ,project scheduling ,constraint programming ,mathematical programming
آدرس k. n. toosi university of technology, faculty of industrial engineering, iran, k. n. toosi university of technology, faculty of industrial engineering, iran
پست الکترونیکی aanajafi@kntu.ac.ir
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved