   A multi-mode resource-constrained project scheduling model with bi-random coefficients for drilling grouting construction project  
   
نویسنده Zhang Zh. ,Xu J.
منبع international journal of civil engineering - 2013 - دوره : 11 - شماره : 1 - صفحه:1 -13
چکیده    To improve the construction efficiency of the longtan hydropower project, this paper studies the multi-mode resourceconstrained project scheduling problem in its drilling grouting construction project. a multiple objective decision making model with bi-random coefficients is first proposed for this practical problem to cope with hybrid uncertain environment where twofold randomness exists. subsequently, to deal with the uncertainties, the chance constraint operator is introduced and the equivalent crisp model is derived. furthermore, the particular nature of our model motivates us to develop particle swarm ptimization algorithm for the equivalent crisp model. finally, the results generated by computer highlight the performances of the proposed model and algorithm in solving large-scale practical problems.
کلیدواژه Optimization model ,Large scale scheduling ,Resource-constrained ,Bi-random coefficients ,Multi-mode
آدرس Nanjing University of Science and Technology, School Economics and Management, CHINA, Sichuan University, State Key Laboratory of Hydraulics and Mountain River Engineering, Uncertainty Decision-Making Laboratory, CHINA
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved