>
Fa   |   Ar   |   En
   assessing temporary speed restrictions and associated unavailability costs in railway infrastructure  
   
نویسنده andrade antónio ramos ,teixeira paulo fonseca
منبع international journal of civil engineering - 2018 - دوره : 16 - شماره : 2 - صفحه:219 -228
چکیده    This paper analyses the occurrence of temporary speed restrictions in railway infrastructure associated with railway track geometry degradation. a negative binomial regression model is put forward to estimate the expected number of temporary speed restrictions, controlling for the main quality indicators of railway track geometry degradation and for the maintenance and renewal actions/decisions. the prediction of temporary speed restrictions provides a quantitative way to support the assessment of unavailability costs to railway users. a case study on the lisbon–oporto portuguese line is explored, comparing three statistical models: the poisson, the ‘over-dispersed’ poisson and the proposed negative binomial regression. main findings suggest that the main quality indicators for railway track geometry degradation are statistically significant variables, apart from the maintenance and renewal actions. finally, a discussion on the impacts of the unavailability costs associated with temporary speed restrictions is also provided in a regulated railway context.
کلیدواژه temporary speed restrictions ,railway maintenance ,statistical modelling ,negative binomial regression ,unavailability costs
آدرس instituto universitário de lisboa (iscte-iul), business research unit (bru-iul), portugal, universidade de lisboa, instituto superior técnico, portugal
 
     
   
Authors
  
 
 

Copyright 2023
Islamic World Science Citation Center
All Rights Reserved