Using Hybrid Fuzzy PROMETHEE II and Fuzzy Binary Goal Programming for Risk Ranking: A Case Study of Highway Construction Projects
|
|
|
|
|
نویسنده
|
مرادپور سمره ,ابراهیم نژاد سعداله ,مهدی زاده اسماعیل ,محمدی آرش
|
منبع
|
journal of optimization in industrial engineering - 2011 - دوره : 4 - شماره : 9 - صفحه:47 -55
|
چکیده
|
Inherently fuzzy, debates will arise in ranking alternatives due to the closeness of the values of the criteria. in this research, the fuzzy promethee ii is proposed as a solution in such conditions. first, using the anp method, the criteria are weighted. then, the ranking process is accomplished both by the fuzzy promethee ii and the fuzzy topsis methods. finally, calculating spearman correlation coefficient, the results of these two approaches are compared. then, the most important risks are selected via the fuzzy binary goal programming and ranked again through the fuzzy promethee ii and fuzzy topsis methods finally, in the last step, these ranking two are compared. as a case study, highway construction risks are ranked through this method.
|
کلیدواژه
|
Fuzzy PROMETHEE II ,Fuzzy TOPSIS ,ANP ,Risk Management
|
آدرس
|
islamic azad university, MSc, Department of industrial engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran, ایران, islamic azad university, Assistant Professor, Department of Industrial Engineering, , Karaj Branch, Islamic Azad University, Karaj , Iran, ایران, islamic azad university, Assistant Professor, Department of industrial engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran, ایران, islamic azad university, MSc, Department of Industrial Engineering, Tehran South Branch, Islamic Azad University, Tehran , Iran, ایران
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Authors
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|