>
Fa
  |  
Ar
  |  
En
  
journal of optimization in industrial engineering
  
سال:2010 - دوره:4 - شماره:5
  
 
A Multi Objective Optimization Approach for Resources Procurement of Bank
- صفحه:55-66
  
 
A Simulated Annealing Algorithm for Multi Objective Flexible JobShop Scheduling with Overlapping in Operations
- صفحه:17-28
  
 
Layout of Cellular Manufacturing System in Dynamic Condition
- صفحه:43-54
  
 
Maximal Benefit Location Problem for A Congested System
- صفحه:73-83
  
 
Mobile Robot Online Motion Planning Using Generalized Voronoi Graphs
- صفحه:1-15
  
 
Outsourcing or Insourcing of Transportation System Evaluation Using Intelligent Agents Approach
- صفحه:35-41
  
 
Trajectory Optimization of Cable Parallel Manipulators in Point-to-Point Motion
- صفحه:29-34
  
 
Two-stage Production Systems under Variable Returns to Scale Technology: A DEA Approach
- صفحه:67-71
Copyright 2023
Islamic World Science Citation Center
All Rights Reserved