|
|
a new bi-objective mathematical model to optimize reliability and cost of aggregate production planning system in a paper and wood company
|
|
|
|
|
نویسنده
|
ramyar mohammad ,mehdizadeh esmaeil ,hadji molana mohammad
|
منبع
|
journal of optimization in industrial engineering - 2020 - دوره : 13 - شماره : 1 - صفحه:81 -98
|
چکیده
|
In this research, a bi-objective model is developed to deal with a supply chain including multiple suppliers, multiple manufacturers, and multiple customers, addressing a multi-site, multi-period, multi-product aggregate production planning (app) problem. this bi-objective model aims to minimize the total cost of supply chain including inventory costs, manufacturing costs, work force costs, hiring, and firing costs, and maximize the minimum of suppliers' and producers' reliability by considering probabilistic lead times to improve the performance of the system and achieve a more reliable production plan. to solve the model in small sizes, a ε-constraint method is used. a numerical example, by utilizing the real data from a paper and wood industry, is designed and the model performance is assessed. with regard to the fact that the proposed bi-objective model is np-hard, one multi-objective harmony search algorithm is used for large-scale problems and its results are compared with the nsga-ii algorithm. the results demonstrate the capability and efficiency of the proposed algorithm in finding pareto solutions.
|
کلیدواژه
|
multiobjective ,aggregate production planning ,supply chain ,reliability ,harmony search ,nsgaii
|
آدرس
|
islamic azad university, tehran science and research branch, college of engineering, department of industrial engineering, iran, islamic azad university, qazvin branch, faculty of industrial and mechanical engineering, iran, islamic azad university, tehran science and research branch, college of engineering, department of industrial engineering, iran
|
پست الکترونیکی
|
molana@srbiau.ac.ir
|
|
|
|
|
|
|
|
|
|
|
|
Authors
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|